Share case study

Steering Asset Management Rather Than Just Managing It—With an Objective Maturity Assessment

Initial Situation

An energy infrastructure network operator wanted to further develop its asset management in a targeted manner, but lacked an objective basis for doing so.

  • Processes and systems are in place, but there is no reliable picture of the level of maturity 
  • Maintenance efficiency, data quality, and the degree of digitization cannot be assessed 
  • Modern maintenance strategies (e.g., condition-based, predictive) not classified 
  • Increasing demands regarding availability, costs, and compliance—without a framework for management 

Solution & Procedure

For the first time, a structured asset management benchmark was used to provide a comprehensive, objective assessment of the current situation.

  • Analysis of eight key areas of focus, including master data, maintenance processes, interfaces (purchasing, warehouse), KPIs, and compliance 
  • Classification based on a defined maturity model and comparison with established industry benchmarks 
  • A streamlined process: from workshop to analysis to presentation of results within three weeks 
  • Result: A management presentation outlining prioritized areas of action and a roadmap for short- and long-term measures 

Results & Added Value

Business Impact: 

  • For the first time, a solid basis for decision-making regarding investments and transformation initiatives has been established 
  • Areas of action can be prioritized based on their impact and level of maturity—rather than on the basis of assumptions or case-by-case assessments 
  • The current state of development was systematically evaluated and made comparable across eight areas of action 
  • Laying the groundwork to specifically address increasing demands for availability, efficiency, and compliance 

Output:

  • Prioritized roadmap with short-term measures (3–12 months) and strategic development areas (1–3 years) 
uc_stacked_images_elementor_7c43cac_item1 uc_stacked_images_elementor_7c43cac_item2 uc_stacked_images_elementor_7c43cac_item3 uc_stacked_images_elementor_7c43cac_item4
We'd be happy to help you with your project at
!
Share case study
Further case studies
casestudy
casestudy
casestudy

Request a free, comprehensive comparison of procurement channels

Download Information Materials

Download Information Materials

Download Information Materials

Download Information Materials

Download Information Materials

Download Information Materials

Download Information Materials

Download Information Materials

Download Information Materials

Download Information Materials

Download Information Materials

Download Information Materials

Download Information Materials

Download Information Materials

Download Information Materials

Download Information Materials